top of page
Fridays.png

FRIDAYS

Fridays.png

CLIENT: Friday's

PROJECT LOCATION: Yorkshire & North East

24 hour turnaround

  • The site wanted a new epoxy floor fitting to the wash-up area.

  • The equipment was disconnected at 7am.

  • The new floor was put down overnight.

  • The equipment was deep cleaned before going back to site at 7am the following day where it was re-connected and commissioned ready for use

Download Case Study

bottom of page